• Indico style
  • Indico style - inline minutes
  • Indico style - numbered
  • Indico style - numbered + minutes
  • Indico Weeks View

Choose timezone

Your profile timezone:
Use timezone based on:
Login

QIKR Shielding Preliminary Design Review
QIKR Shielding Preliminary Design Review

3 March 2025
Building 8600
US/Eastern timezone
  • Overview
  • Agenda
  • Participants
  • Supporting Documents
  • Presentations
  • Closeout Template
  • Closeout Report Template
  • PPT version of presentations

Talia Dix

  • holdertm@ornl.gov
  • 865-241-7667

Supporting Documents

STS Project Interface Sheet for Instrument Bunker Wall Feedthroughs and the Bunker Wall Structure (S01020500-IST10023 R00)

STS Interface Control Drawing Instrument PITS (S04010100-C8U-8800-A10000)

QIKR Cave Acceptable Dose Rates Design Criteria Document (S04080400-DCD10000-R00)

QIKR Requirements Document (S04080100-SRD10000-R02)

QIKR Radiation Shielding Configuration and Quality Level (S04080400-QAI10000-R00)

QIKR Non-Radiation Shielding Configuration and Quality Level (S04080400-QAI10001-R00)

Generation of Beamline Sources- Preliminary Design (S04030200-TRT10002)

Radiation Safety Policy and Plan (S01030100-PN0001)

QIKR Shielding FMEA document (S04080400-FMA10000-R00)

Indico
Powered by Indico v3.3.6
  • Help
  • Contact