13–18 Oct 2019
Chattanooga Convention Center
US/Eastern timezone

Conventional ring designs for ISIS II

17 Oct 2019, 14:30
25m
Meeting Room 8 (Chattanooga Convention Center)

Meeting Room 8

Chattanooga Convention Center

Oral Presentation Accelerator Accelerator

Speaker

Mr Dean Adams (STFC/RAL)

Description

The ISIS upgrade project is tasks with delivering a 1.25 MW, 1.2 GeV proton beam at 50 Hz shared between two target stations. Accelerator studies include conventional rapid cycling synchrotrons (RCS), accumulator rings and FFA’s. This paper reviews the current status of the conventional RCS and Accumulator rings and includes lattice designs and injection studies for both H- and direct proton injection.

Primary author

Mr Dean Adams (STFC/RAL)

Co-authors

Presentation materials