Documents will be added as recieved. Several documents have been requested across teams and will be listed within only one grouping.
Neutron Scattering Division Org Chart
Neutron Technologies Division Org Chart
Research Accelerator Division Org Chart
Management Team Documents
FINAL Critique Report - LWS#1 HOG Leak Event
Engineering/Operations Team Documents
Facility Safety Team Documents
- FSAD-PF
- FSAD-NF
- ASE
- USI procedure
- USI Evaluation for Putting SBDPMS into Flow Mode with the Service Bay T-Beams Removed During the FY24A Outage
- USI Evaluation for Increased Helium Gas Holdup in the Mercury Process Loop During Gas Commissioning Testing with Beam
- USI Evaluation for the Use of Far West Area Radiation Monitors as PPS Interlocked Area Radiation Monitors
- SNS-OPM 2.B-10 Unreviewed Safety Issue Procedure
- SNS-OPM-ATT 2.B-10.a Reviewed Safety Issue Documentation Form
- SNS-OPM-ATT 2.B-10.b Unreviewed Safety Issue Identification and Recognition Form
- 106010200-NCR10007
- 108000000-PR0061
- DOE O 420.2D implementation plan
- PPU Safety Evaluations
- USI Evaluation for Increasing the Allowable Target Gas Injection Rate to 2 SLPM
- USI Evaluation for increasing allowable target gas injection flow to 10 SLPM contingent on continued stable behavior.
- PRELIMINARY HAZARD ANALYSIS IN SUPPORT OF THE PROTON POWER UPGRADE PROJECT
- PROTON POWER UPGRADE PROJECT HAZARD ANALYSIS REPORT
- Training for operations and Engineers on FSADs and ASE
- ASE Rev 7 Changes Presentation for Operators
- ASE Rev 7 CRAS CRSS Training Log Feb 2024
- ASE Rev 7 OST Training Log Feb 2024
- CEC System Engr Training Overview Presentation
- Safety Documentation Overview Training - Rev 5.1 - Feb2024
- SNS CEC 1 KA_Target Protection System_08Feb2024_Kelly Mahoney
- SNS CEC 1 RR_Target Protection System_08Feb2024_Kelly Mahoney
- SNS CEC 17 KA_Mercury Heat Exchanger Double-Wall Design_16Feb2024_Drew Winder
- SNS CEC 17 RR_Mercury Heat Exchanger Double-Wall Design_16Feb2024_Drew Winder
- SNS CEC 23 KA_Cryogenic Moderator System Catalytic Converter Retention Elements_19Feb2024_Brian DeGraff
- SNS CEC 23 RR_Cryogenic Moderator System Catalytic Converter Retention Elements_19Feb2024_Brian DeGraff
- PPU ARR Close Out Report
- Clarifying Info For Facility Safety Team Documents
- SNS CCR Interview Notes_Facility Safety Team
Health & Safety Team Documents
- Research Safety Summaries / Associated Standard Operating Procedures
- Final Critique Report - LWS#1 HOG Leak Event
Accelerator Operations Team Documents
- Venus IRR
- PPU ARR Indico Site See Jennifer for Password
- Design Change Notices
- Notices are listed on linked report and available in EDRM